Reconstruction of the Highway following nine (9) land slips. Works have been carried out for an extended period under traffic with one way traffic flow. The one way system extends for a total of 5 km. Burchills were engaged to provide traffic engineering support to the Contractor. A Traffic Management Assessment was carried out initially to review the Traffic Management Plan and on-site procedures. The assessment recommended management measures to augment existing strategies to reduce risk. Prior to reverting to single lane flow, another review was carried out in October 2012. The review analysed traffic incident data for the previous 18 months and categorized it to assist in determining appropriate and practical mitigation measures. These measures have been implemented on-site with positive results