Project Portfolio

Click on your area of interest

Gainsborough Greens - Pimpama River Flood Study (2002 - present)

Flood investigations are being completed by Burchills Engineering Solutions on behalf of MIRVAC as part of recent Development Applications within the Pimpama River catchment, upper Coomera. Gainsborough Greens is a master planned residential community development comprising of over 2,000 lots. Investigations involved river (MIKE11 and TUFLOW) and catchment (WBNM, XP-RAFTS and Rational) modelling to define the existing flood extent and subsequent impact assessment and drainage design. This is also identifying flood affected properties, local flood levels and environmental buffers, impact assessment and mitigation strategies. The flood modelling domain covers an area of 22 km2.

Water staff involved in the project:

Philip Bell
Principal Engineer
Tel: (07) 5509 6400
Email: philip.bell@burchills.com.au



Toby Bennett
Civil & Environmental Engineer
Tel: (07) 5509 6400
Email: toby.bennett@burchills.com.au



Ali Rabiei
Senior Water Resources Engineer
Tel: (07) 5509 6400
Email: ali.rabiei@burchills.com.au